NUIG Arts & Science Building – External Frame Upgrade

Health & Safety Plan:

Health & Safety Plan

Click to access Health & Safety Plan – Version 1.1

 

Company Health & Safety Statement:

Company Health & Safety Statement

Click to access the McNamara Construction Company Health & Safety Statement – Version 2.0

 


Appendix 1 – Site Specific Information

  • Form MNC1 – Project Information Sheet
  • Form MNC2 – Emergency Contact Information
  • Form MNC3 – Mandatory Site Requirements Checklist
  • Form MNC4 – Site Rules
  • Safe System of Work Plan (SSWP)
  • Form MNC6 – Identification of Specific Site Safety Issues
  • Form MNC23 – Contractor / Sub-Contractor Information
  • Form MNC24 – Visitor Sign-in Sheet

 

  • Preliminary Health & Safety Plan (Issued by PSDS)
  • Existing Health and Safety File (Issued by client if available)
  • Refurbishment / Demolition Asbestos Survey – RDAS
  • Risk Assessment Register for the Architectural Design. (Provided by designer if issued)
  • Programme of the works
  • Project Team
  • Waste Management Plan
Appndix 1

Click to access Appendix 1

 

 

 

 

 

 

 


Appendix 2 – Formal Correspondence

  • Form AF1 (If Applicable)
  • AF2
  • Letters of Appointment / Project Acceptance Docs
  • Insurances
  • Statutory and Utilities Correspondence
    • Correspondence and any other relevant information related to statutory authorities and utility organisations (e.g. Health and Safety Authority, ESB Networks, Gas Networks Ireland).
  • Traffic Management Plans
    • Including correspondence with the An Garda Síochána and local authorities, etc.
  • Safety File Information
    • Subcontractors safety documentation.
  • Work Instructions / Orders
  • Site Meeting Minutes
  • Other pertinent forms
Appendix 2

Click to access Appendix 2

 

 

 

 

 

 

 


Appendix 3 – Site Specific Records

  • Form MNC5 – Site Inspection Checklist
    • Completed Copies incorporated into file each week
  • GA1 – Thorough Examination of Lifting Appliances
  • GA2 – Weekly Inspection of Lifting Appliances
  • GA3 – Work at Height Inspections
  • AF3 – Thorough Examination of Excavations
  • AF4 – Inspection / Examination of Personal Flotation Devices
  • Scaffolding Checklist 1 – Inspection Before Use
  • Scaffolding Checklist 2 – Inspection During Use
  • Scaffolding Handover Certificate
  • Form MNC16 – Excavation Permit
  • Form MNC17 – Hot Work Permit
  • Form MNC19 – Method Statement (If Required)
  • Form MNC20 – Permit to Work
  • Form MNC21 – Coordination Meeting Minutes
  • Photos
Appendix 3

Click to access Appendix 3

 

 

 

 

 

 

 


Appendix 4 – Forms & Registers

  • Form MNC7 – Site induction Forms
    • Completed by employees / sub-contractors as project proceeds
Site Inductions

Click to access Site Inductions

 

  • Photos of Safe Pass cards / CSCS Cards
  • Form MNC8 – Induction / Safe Pass / CSCS / Training Register

Safepass Card photos of site personnel:

 

Safepass Cards Photos

Click to access Safepass cards

Solas Safepass Data Protection Notice

CSCS Card photos of site personnel:

 

 

CSCS Cards

Click to access CSCS Cards

Safety Management Certification:

 

Safety Management Certs

Click to access Safety Management Certs

 

General Company Safety Registers & Checklists (Available upon Request):

  • Form MNC9 – Personal Protective Equipment Register
  • Form MNC10 – Responsible Persons Task Register
  • Form MNC11 – Tool Box Talk Registration Form
  • Form MNC12 – Excavator Safety & Lifting Appliance Weekly Examination
  • Form MNC13 – Truck Safety Check Sheet
  • Form MNC14 – Plant Safety Check Sheet
  • Form MNC15 – Fitter’s Safety Repair Sheet
  • Form MNC18 – Report of Weekly Equipment (Straight Ladders / Step Ladders / Podium Steps) Examination

 


Appendix 5 – Accident / Incident Investigation

Thankfully, nothing to report.

 

 


Appendix 6 – Safety Data Sheets

Site Specific Safety Data Sheet Library:

Site Specific SDS

Click to access Site Specific Safety Data Sheet

Safety Data Sheet Library:

Safety Data Sheet Library

Click on Image to access Safety Data Sheet Library

 


Appendix 7 – Handover Documents – (Safety File & BCAR)

  • Form MNC25 – Residual Risk Report
  • Form MNC26 – Maintenance Programme

 

Certificate Abbreviations:             

AFDC – Air Flow Design Calculations

Cs – CIF01 – Ancillary Certificate of Compliance on Completion

Si – RIAI-ACI-02 –  Ancillary Certificate of Compliance on Completion – Specialist

Sc – RIAI-ACCD-02 – Ancillary Certificate of Compliance: Design – Specialist

CC – Commissioning Cert

DoC – Declaration of Conformity

DoP – Declaration of Performance

AgC –  NSAI Agrément Cert

OMM – Operation & Maintenance Manual

PDS – Product Data Sheet

PSS – Product Spec Sheet

SDC – Supplier Delivery Cert

SDS – Safety Data Sheet

TDS – Technical Data Sheet

 

Typical File Structure:

1             Substructure

1.1         Foundations

1.2         Floor Structure

 

2             Superstructure

2.1         Blockwork

2.2         Intermediate Floors i.e. Hollowcore

2.3         Structural Steel

2.4         Roof

2.5         Windows + Doors

2.6         External Plastering

2.7         Gutters + RWP’s

 

3             First Fix + Second Fix

3.1         Electrical

3.2         Plumbing

3.3         Heating

3.4         Ventilation

3.5         Insulations

3.6         Screeds

3.7         Partitions + Slabbing

3.8         Air tightness

3.9         Internal Plastering

3.10       Carpentry

 

4             Fixtures + Fittings + Finishes

4.1         Kitchen

4.2         Tiling

4.3         Wardrobes

4.4         Skirting + Architrave

4.5         Painting

4.6         Floor Finishes

4.7         Wall Finishes

4.8         Bathrooms

4.9         External Building Finishes

 

5             Groundworks – Finishes

5.1         Sewers

5.2         External Services

 

6             Final Certification

Appendix 7

Click to access Appendix 7