Appendix 1 – Site Specific Information
- Form MNC1 – Project Information Sheet
- Form MNC2 – Emergency Contact Information
- Form MNC3 – Mandatory Site Requirements Checklist
- Form MNC4 – Site Rules
- Safe System of Work Plan (SSWP)
- Form MNC6 – Identification of Specific Site Safety Issues
- Form MNC23 – Contractor / Sub-Contractor Information
- Form MNC24 – Visitor Sign-in Sheet
- Preliminary Health & Safety Plan (Issued by PSDS)
- Existing Health and Safety File (Issued by client if available)
- Refurbishment / Demolition Asbestos Survey – RDAS
- Risk Assessment Register for the Architectural Design. (Provided by designer if issued)
- Programme of the works
- Project Team
- Waste Management Plan
Appendix 2 – Formal Correspondence
- Form AF1 (If Applicable)
- AF2
- Letters of Appointment / Project Acceptance Docs
- Insurances
- Statutory and Utilities Correspondence
- Correspondence and any other relevant information related to statutory authorities and utility organisations (e.g. Health and Safety Authority, ESB Networks, Gas Networks Ireland).
- Traffic Management Plans
- Including correspondence with the An Garda Síochána and local authorities, etc.
- Safety File Information
- Subcontractors safety documentation.
- Work Instructions / Orders
- Site Meeting Minutes
- Other pertinent forms
Appendix 3 – Site Specific Records
- Form MNC5 – Site Inspection Checklist
- Completed Copies incorporated into file each week
- GA1 – Thorough Examination of Lifting Appliances
- GA2 – Weekly Inspection of Lifting Appliances
- GA3 – Work at Height Inspections
- AF3 – Thorough Examination of Excavations
- AF4 – Inspection / Examination of Personal Flotation Devices
- Scaffolding Checklist 1 – Inspection Before Use
- Scaffolding Checklist 2 – Inspection During Use
- Scaffolding Handover Certificate
- Form MNC16 – Excavation Permit
- Form MNC17 – Hot Work Permit
- Form MNC19 – Method Statement (If Required)
- Form MNC20 – Permit to Work
- Form MNC21 – Coordination Meeting Minutes
- Photos
Appendix 4 – Forms & Registers
- Form MNC7 – Site induction Forms
- Completed by employees / sub-contractors as project proceeds
- Photos of Safe Pass cards / CSCS Cards
- Form MNC8 – Induction / Safe Pass / CSCS / Training Register
Safepass & CSCS Card photos of site personnel:
Solas Safepass Data Protection Notice
Safety Management Certification:
General Company Safety Registers & Checklists (Available upon Request):
- Form MNC9 – Personal Protective Equipment Register
- Form MNC10 – Responsible Persons Task Register
- Form MNC11 – Tool Box Talk Registration Form
- Form MNC12 – Excavator Safety & Lifting Appliance Weekly Examination
- Form MNC13 – Truck Safety Check Sheet
- Form MNC14 – Plant Safety Check Sheet
- Form MNC15 – Fitter’s Safety Repair Sheet
- Form MNC18 – Report of Weekly Equipment (Straight Ladders / Step Ladders / Podium Steps) Examination
Appendix 5 – Accident / Incident Investigation
Thankfully, nothing to report.
Appendix 6 – Safety Data Sheets
Site Specific Safety Data Sheet Library:
Safety Data Sheet Library:
Appendix 7 – Handover Documents – (Safety File & BCAR)
- Form MNC25 – Residual Risk Report
- Form MNC26 – Maintenance Programme
Certificate Abbreviations:
AFDC – Air Flow Design Calculations
Cs – CIF01 – Ancillary Certificate of Compliance on Completion
Si – RIAI-ACI-02 – Ancillary Certificate of Compliance on Completion – Specialist
Sc – RIAI-ACCD-02 – Ancillary Certificate of Compliance: Design – Specialist
CC – Commissioning Cert
DoC – Declaration of Conformity
DoP – Declaration of Performance
AgC – NSAI Agrément Cert
OMM – Operation & Maintenance Manual
PDS – Product Data Sheet
PSS – Product Spec Sheet
SDC – Supplier Delivery Cert
SDS – Safety Data Sheet
TDS – Technical Data Sheet
Typical File Structure:
1 Substructure
1.1 Foundations
1.2 Floor Structure
2 Superstructure
2.1 Blockwork
2.2 Intermediate Floors i.e. Hollowcore
2.3 Structural Steel
2.4 Roof
2.5 Windows + Doors
2.6 External Plastering
2.7 Gutters + RWP’s
3 First Fix + Second Fix
3.1 Electrical
3.2 Plumbing
3.3 Heating
3.4 Ventilation
3.5 Insulations
3.6 Screeds
3.7 Partitions + Slabbing
3.8 Air tightness
3.9 Internal Plastering
3.10 Carpentry
3.11 Stairs + Balustrades + Handrails
4 Fixtures + Fittings + Finishes
4.1 Kitchen
4.2 Tiling
4.3 Wardrobes
4.4 Skirting + Architrave
4.5 Painting
4.6 Floor Finishes
4.7 Wall Finishes
4.8 Bathrooms
4.9 External Building Finishes
5 Groundworks – Finishes
5.1 Sewers
5.2 External Services
6 Final Certification